首页> 外文会议>International Symposium on Symbolic and Numeric Algorithms for Scientific Computing >An Adaptive Recommender System for Human Resource Allocation in Software Projects - Initial Results on an Agent-Based Simulation
【24h】

An Adaptive Recommender System for Human Resource Allocation in Software Projects - Initial Results on an Agent-Based Simulation

机译:软件项目中人力资源分配的自适应推荐系统-基于Agent的模拟的初步结果

获取原文

摘要

In our previous work we have introduced a skill-based mathematical model of resource allocation. This paper extends our skill based approach by introducing adaptive skill sets for employees and a history-based initial evaluation strategy. For this purpose, the mathematical model is adjusted in order to modify skill vectors after a task allocation. In turn this enables estimations of the time to task completion based on employee history. This approach would provide the team leaders with a better view of the skill sets mastered by the team. We experimentally evaluate the impact of the skill adjustment on the project duration and cost in a simulation environment. The conclusion of the experiment is that taking into account the implicit skill gain of employees during their daily activity decreases projected costs and execution time significantly, which is this paper's contribution to the state of the art. This approach is a good way to keep the team's skill sets automatically updated. The experiment is designed as an agent society simulation and through their interactions raw data is collected in order to calculate the performance measures. A scalability experiment is also presented showing slight (1%) decreases in project duration when the task number doubles while costs decrease between 7-32%.
机译:在我们之前的工作中,我们介绍了一种基于技能的资源分配数学模型。本文通过引入针对员工的自适应技能集和基于历史的初始评估策略,扩展了我们基于技能的方法。为此,调整数学模型以便在任务分配后修改技能向量。继而,这使得能够基于员工历史来估计完成任务的时间。这种方法可以使团队领导者更好地了解团队掌握的技能。我们通过实验评估技能调整对模拟环境中项目工期和成本的影响。实验的结论是,考虑到员工在日常活动中的隐性技能增益,可显着减少预计的成本和执行时间,这是本文对最新技术水平的贡献。这种方法是保持团队技能自动更新的好方法。该实验被设计为代理商社会模拟,并通过它们之间的相互作用收集原始数据,以计算绩效指标。还提出了一个可伸缩性实验,当任务数量增加一倍时,项目工期缩短了1%,而成本却降低了7-32%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号