首页> 外文会议>International Conference on Industrial Engineering and Applications >Risk management model of 69 kV power transformer bushing in Metropolitan substation
【24h】

Risk management model of 69 kV power transformer bushing in Metropolitan substation

机译:大都市变电站69 kV电力变压器衬套风险管理模型

获取原文

摘要

This paper presents diagnosis techniques to assess the risk of power transformer bushing rating of 69 kV in Metropolitan substation by means of condition evaluation and importance evaluation. Tan delta test with available data is conducted for condition evaluation of the transformer bushing, while the selected criteria with updated network data is utilized for importance evaluation of the power transformer fleet. Score and weighting techniques are used for the transformer risk assessment. To achieve the proper bushing maintenance, the indices of both assessment of the transformer are plotted in the risk model. Consequently, the maintenance action can be accomplished by nine separated maintenance zones with color indicators such as corrective maintenance, time-based maintenance, condition-based maintenance, and online monitoring. In the analysis, 30 power transformers with rating of 69/24 kV are selected for planning the maintenance action of the 69 kV bushing in Metropolitan substation. Finally, the reduced transformer risk and improved reliability in the system can be achieved with decreased maintenance costs.
机译:本文通过条件评估和重要评估,提出了评估大都会变电站电力变压器衬套额定值的风险。具有可用数据的TAN DELTA测试进行变压器衬套的条件评估,而具有更新网络数据的所选标准用于电源变压器车队的重要性评估。分数和加权技术用于变压器风险评估。为了实现适当的衬套维护,在风险模型中绘制了变压器评估的索引。因此,维护动作可以通过九个分离的维护区域实现,其中彩色指示器,例如校正维护,基于时间的维护,基于条件的维护和在线监控。在分析中,选择具有69/24 kV等级的30个电力变压器,用于规划大都会变电站69 kV套管的维护动作。最后,通过降低的维护成本,可以实现减少的变压器风险和系统的提高可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号