【24h】

Algorithm Research of the ICCMS for Qinshan Phase Ⅱ NPP Based on FirmSys Platform

机译:基于FirmSys平台的秦山Ⅱ期核电厂ICCMS算法研究。

获取原文

摘要

The ICCMS is a safety level system, which monitors the cooling state of reactor core and the water level of reactor pressure vessel. The ICCMS of Qinshan Phase Ⅱ NPP has been running for over ten years since combined to the grid, and the algorithm of the original system is only for traditional simulation system. There is no algorithm for digital control system. So it needs to design and development new algorithm for new ICCMS system to solve it. This paper mainly introduces the design process of the algorithm in new ICCMS system; it has three parts which are core temperature measurement, core cooling monitoring, and the water level of reactor pressure vessel measurement. The overall algorithm is split into twelve subroutines which are called through a root program by modularization method. It is not only a suitable solution for ICCMS system of Qinshan Phase Ⅱ NPP but also can be used for reference of the design of core cooling monitoring system for PWR nuclear power station under EOP regulations. At present, the modified ICCMS system is running well. It proves that the new algorithm designed is fully complies with the original operating procedures.
机译:ICCMS是一个安全水平系统,用于监视反应堆堆芯的冷却状态和反应堆压力容器的水位。秦山二期核电厂并网运行至今已有十余年,原始系统的算法仅适用于传统的仿真系统。没有用于数字控制系统的算法。因此,需要为新的ICCMS系统设计和开发新的算法来解决它。本文主要介绍了新的ICCMS系统中算法的设计过程。它由三部分组成,分别是堆芯温度测量,堆芯冷却监控和反应堆压力容器水位测量。整个算法分为十二个子例程,这些子例程通过模块化方法通过根程序进行调用。它不仅是秦山二期核电厂ICCMS系统的合适解决方案,而且可以作为EOP规定下压水堆核电站堆芯冷却监控系统设计的参考。目前,改进后的ICCMS系统运行良好。证明所设计的新算法完全符合原始操作规程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号