首页> 外文会议>Annual highway geology symposium >Geologic characterization along the City of Atlanta Raw Water Tunnel, Fulton County, Georgia
【24h】

Geologic characterization along the City of Atlanta Raw Water Tunnel, Fulton County, Georgia

机译:佐治亚州富尔顿县亚特兰大原水隧道​​沿线的地质特征

获取原文

摘要

The City of Atlanta Department of Watershed Management has initiated the Raw Water Delivery Project that will provide a reliable and secure raw water conveyance system to move water from the Chattahoochee River to the City's water treatment plants. The scope of this project includes constructing a new raw water conveyance system that will connect the Chattahoochee River to the Chattahoochee Water Treatment Plant, the Hemphill Water Treatment Plant, the Hemphill Complex Reservoirs, and the Bellwood Quarry.
机译:亚特兰大市流域管理部已经启动了原水输送项目,该项目将提供可靠且安全的原水输送系统,以将水从查塔胡奇河输送到市内的水处理厂。该项目的范围包括建设一个新的原水输送系统,该系统将把查塔胡奇河与查塔胡奇水处理厂,汉普希尔水处理厂,汉普希尔综合水库和贝尔伍德采石场连接起来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号