首页> 外文会议>Annual highway geology symposium >Marina Fire Rockfall Protection: A rapid, practical response
【24h】

Marina Fire Rockfall Protection: A rapid, practical response

机译:Marina Fire Rockfall Protection:快速,实际的反应

获取原文

摘要

The Marina Fire (July 2016) resulted in significant increase in rockfall risk to a portion of US 395 in Mono County, California. This corridor is the main north-south transportation artery on the east side of the Sierra Nevada providing access to Yosemite National Park, Mammoth ski area and Southern California. The roadway is cut into a slope comprised of colluvium and interspersed tufa from relict shorelines of Mono Lake. Due to rockfall events impacting the roadway immediately post-fire, safely keeping the road open to traffic was a priority for Caltrans. A rapid response was executed to assess the hazard and implement a mitigation strategy for this segment of roadway. Working in conjunction with Caltrans, Yeh engineering geologists evaluated the rockfall trajectories impacting the roadway and provided recommendations for installing a temporary flexible rockfall fence. Two Geobrugg flexible rockfall fences, 2,000 linear feet of GBE 500AR (3m height) and 1,500 linear feet of model GBE 500AR (4m height) were recommended. A significant constraint was the presence of a critical fiber optic utility at the base of the slope, which was installed via horizontal directional drilling. Due to the uncertainty of the precise location of this utility, excavation and drilling to install post support system and ground anchors for the post support were a primary concern. Design modifications were made to accommodate the site conditions. Of particular note was the design of the post support system. The fence posts did not have the typical concrete foundation type support systems but instead were supported globally by a wire rope support system and locally with number 10 threaded bar, 18 inches in depth. This design did not encroach on the buried utility and facilitated rapid construction, enabling the installation to be completed within a matter of weeks.
机译:滨海大火(2016年7月)导致落石风险显着增加,使加利福尼亚州莫诺县的一部分US 395。该走廊是内华达山脉东侧的主要南北运输动脉,可通往优胜美地国家公园,猛mm滑雪场和南加州。从莫诺湖的遗迹海岸线将巷道切成由坡度和散布的石灰石组成的斜坡。由于落石事件会在火灾后立即影响巷道,因此确保Caltrans的安全是道路通行的首要任务。快速响应被执行以评估危害并针对该路段实施缓解策略。 Yeh工程地质学家与Caltrans合作,评估了影响巷道的落石轨迹,并提供了安装临时柔性落石围栏的建议。建议使用两个Geobrugg柔性落石围墙,建议使用2,000线性英尺的GBE 500AR(3m高度)和1,500线性英尺的GBE 500AR型号(4m高度)。一个重要的限制是在斜坡底部存在一个关键的光纤工具,该工具是通过水平定向钻孔安装的。由于该实用工具的精确位置不确定,因此安装支柱支撑系统和用于支柱支撑的地锚的挖掘和钻孔是首要考虑的问题。进行了设计修改以适应现场条件。特别值得注意的是职位支助系统的设计。围栏柱没有典型的混凝土基础类型的支撑系统,而是由钢丝绳支撑系统全局支撑,局部由深度为18英寸的10号螺纹杆支撑。这种设计不会侵害埋在地下的公用设施,并促进了快速施工,使安装可以在几周内完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号