首页> 外文会议>ASME international conference on ocean, offshore and arctic engineering >DEMONSTRATION TEST FOR USING SUCTION ANCHOR AND POLYESTER ROPE IN FLOATING OFFSHORE WIND TURBINE
【24h】

DEMONSTRATION TEST FOR USING SUCTION ANCHOR AND POLYESTER ROPE IN FLOATING OFFSHORE WIND TURBINE

机译:海上风轮机浮动时使用吸力锚和聚酯绳进行的演示试验

获取原文

摘要

In this paper, outline of the demonstration test for using suction anchor and polyester rope in a floating wind mast (that was converted from floating wind turbine) is presented. After marine soil investigations and specimen test for polyester rope, the basic design methodology for mooring line including polyester rope and suction anchor is presented. Considering the marine soil investigation result, the profile of the suction anchor was determined to be somewhat short and wide dimensions. Installation of the suction anchor was successfully made at both the test site and the targeted demonstration site. Here, a newly developed suction pump system was successfully used. Installation of polyester rope was also made successfully. However, we observed discrepancy in the suction pressure during the installation of suction anchor at the demonstration site, although we did not see the discrepancy at the trial test site.
机译:本文介绍了在浮式风力发电桅杆(由浮式风力涡轮机改造而成)中使用吸力锚和聚酯绳进行的示范性测试的概要。经过海洋土壤调查和聚酯绳的标本测试,提出了包括聚酯绳和吸力锚的系泊缆的基本设计方法。考虑到海洋土壤调查的结果,确定了吸力锚的轮廓为短而宽的尺寸。在测试地点和目标演示地点都成功安装了吸力锚。在这里,成功使用了新开发的抽吸泵系统。聚酯绳的安装也成功完成。但是,尽管在演示测试现场没有看到差异,但在演示站点安装吸力锚期间,我们观察到了吸气压力的差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号