首页> 外文会议>IEEE Central American and Panama Convention >Introducing reliability applications for scheduled outages in Costa Rica using Monte Carlo methods
【24h】

Introducing reliability applications for scheduled outages in Costa Rica using Monte Carlo methods

机译:使用蒙特卡洛方法在哥斯达黎加引入定期停机的可靠性应用

获取原文

摘要

Even if every forced outage in power plants is well documented in the Costa Rican electrical network, the Costa Rican Institute of Electricity (ICE) - a government-owned public utility- does not integrate any reliability adequacy indices in the annual maintenance program for power plants. Currently, the adoption of reliability centered maintenance (RCM) programs is common industry practice to optimize operation and maintenance costs. Therefore, this paper introduces, for the first time in the Costa Rican electrical network, the use of reliability adequacy indices based on non-sequential Monte Carlo simulation tools for the optimization of the power plants' annual maintenance program.
机译:即使在哥斯达黎加的电网中对电厂的所有强迫停机都进行了详细记录,但哥斯达黎加电力学院(ICE)是政府所有的公用事业,在电厂的年度维护计划中也没有整合任何可靠性充足指标。当前,采用以可靠性为中心的维护(RCM)程序是优化行业运营和维护成本的行业惯例。因此,本文首次在哥斯达黎加电网中介绍了基于非顺序蒙特卡洛模拟工具的可靠性充足性指标在电厂年度维护计划优化中的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号