首页> 外文会议>International conference on nuclear engineering >THE APPLICATION OF RISK INFORMED METHOD IN PRESSURE CALIBRATION CYCLE EXTENDING OF RHR SYSTEMS SEBIM VALVE
【24h】

THE APPLICATION OF RISK INFORMED METHOD IN PRESSURE CALIBRATION CYCLE EXTENDING OF RHR SYSTEMS SEBIM VALVE

机译:风险告知方法在系统自力阀压力校准循环扩展中的应用

获取原文

摘要

The stability of the SEBIM valve setting value can be validated based on the pressure calibration test during each refueling cycle. Depending on the feedback of other similar types of nuclear power plants, this test has been revised to two refueling cycles to execute for its excellent performance of SEBIM valves and has got satisfactory performance for several successive refueling cycles. Therefore, this paper will analyze and evaluate the feasibility of extending SEBIM valve setting value test period by employing risk-informed method. The results show that the performance of RHR system's SEBIM valve is satisfactory; the increment risk is small and meets the quantitative risk acceptance criterion. Thus, the pressure calibration test of the RHR system's SEBIM valve can be revised to execute for two refueling cycles.
机译:SEBIM阀设置值的稳定性可以在每个加油周期内根据压力校准测试进行验证。根据其他类似类型的核电站的反馈,该测试已修改为两个加油周期,以执行SEBIM阀门的出色性能,并在多个连续的加油周期中均获得了令人满意的性能。因此,本文将采用风险告知方法来分析和评估延长SEBIM阀设定值测试时间的可行性。结果表明,RHR系统的SEBIM阀的性能令人满意。增量风险小,符合定量风险接受标准。因此,可以将RHR系统的SEBIM阀的压力校准测试修改为执行两个加油周期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号