首页> 外文会议>International conference on nuclear engineering >RESEARCH ON SPECIAL ANALYSIS OF VERIFICATION AND VALIDATION IN NUCLEAR POWER INSTRUMENT AND CONTROL SYSTEM
【24h】

RESEARCH ON SPECIAL ANALYSIS OF VERIFICATION AND VALIDATION IN NUCLEAR POWER INSTRUMENT AND CONTROL SYSTEM

机译:核动力仪表与控制系统验证验证的特殊分析研究

获取原文
获取外文期刊封面目录资料

摘要

At present, there is still lack of detailed software V&V guidance standards in China, while a number of US nuclear power units and I&C platform are introduced and applied. So the software verification and validation work in our country usually cited the methods in IEEE 1012. With reference to the requirements of IEEE 1012, the V&V process of the software can be mainly divided into three forms: audit evaluation, special analysis and testing. This paper focuses on these parts and gives a detailed description and annotations of the technical methods and their life cycle stages in IEEE 1012, which cover multiple V&V phases. At the same time, the author puts forward his own understanding of the special analysis approach and procedure, such as criticality analysis, interface analysis, traceability analysis, hazard analysis, risk analysis and security analysis, and gives his own experience and related recommendations.
机译:目前,中国仍然缺乏详细的软件V&V指导标准,同时引入并应用了许多美国核电单位和I&C平台。因此,我国的软件验证工作通常采用IEEE 1012中的方法。参照IEEE 1012的要求,软件的V&V过程主要可以分为三种形式:审计评估,特殊分析和测试。本文重点介绍这些部分,并详细介绍和注释了IEEE 1012中的技术方法及其生命周期阶段,涵盖了多个V&V阶段。同时,作者对关键分析,界面分析,可追溯性分析,危害分析,风险分析和安全性分析等特殊分析方法和程序提出了自己的理解,并给出了自己的经验和相关建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号