This paper presents techno-economic studies for grid connection of a new 1700MW generating plant in the vicinity of Sohar port area which is planned to be commissioned by January 2019. The objective is to justify the required capital expenditure on the basis of the submission of a full, complete and robust study, in the form of Pre-Investment Appraisal Document (PIAD), insuring the transmission system in Oman is planned, developed and operated in an efficient manner. Five options for connecting the Sohar generating plant to the Main Interconnected Transmission System (MITS) have been assessed and the most efficient financially, technically and lower risk option is selected. The paper describes the assessment for each option from different aspects, technically, financially and risk of deliverability of the project. The assessment of each option has been carried out on the basis of the following performance considerations: compliance with the Transmission Security Standard (TSS), capital cost, Net Present Value (NPV), environmental considerations, safety and flood risk assessment. Power losses have also been considered in the NPV calculation. In addition, the paper describes the optimal generation connection design in accordance with the TSS criteria. The compliance with TSS requirements has been assessed by steady state and dynamic studies for both peak and off peak demand with full evacuation of the new Sohar power plant, using the DIgSILENT professional software. The results include load flow analysis in N, (N-1), and (N-M-1) operating conditions, short-circuit levels, and transient stability.
机译:本文介绍了计划于2019年1月投入运营的苏哈尔港口地区附近新建1700MW发电站并网的技术经济研究。以投资前评估文件(PIAD)的形式进行全面,完整和可靠的研究,以确保以有效的方式计划,开发和操作阿曼的传输系统。已评估了将Sohar发电站连接至主要互连输电系统(MITS)的五个选项,并选择了最有效的财务,技术和风险较低的选项。本文从技术,财务和项目交付风险的不同方面描述了每个选项的评估。每个选项的评估都是基于以下性能考虑进行的:遵守传输安全标准(TSS),资本成本,净现值(NPV),环境考虑,安全和洪水风险评估。在NPV计算中还考虑了功率损耗。此外,本文还描述了根据TSS标准的最佳发电连接设计。通过使用DIgSILENT专业软件完全撤离新的Sohar电厂,通过稳态和动态研究评估了高峰和非高峰需求是否符合TSS要求。结果包括在N,(N-1)和(N-M-1)运行条件下的潮流分析,短路水平和暂态稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号