首页> 外文会议>IEEE International Conference on Communication Technology >Study on modeling method of leaky coaxial cable network channel in underground coal mine
【24h】

Study on modeling method of leaky coaxial cable network channel in underground coal mine

机译:煤矿井下泄漏同轴电缆网络通道建模方法研究

获取原文

摘要

To study the high speed data communication and fault diagnosis of the leaky coaxial cable (leaky cable) network in underground coal mine, a method based on multipath propagation for establishing the leaky cable network channel model is proposed. The multipath propagation of the leaky cable network and the transfer characteristic of the leaky cable are analyzed. The transfer function between the network terminals is solved based on the multipath propagation, and the channel model of the leaky cable network is established. The results have been verified successfully by comparing the measurement results with simulations based on the model, which is obvious that simulation and measurement differ only in minor details.
机译:为了研究地下煤矿泄漏同轴电缆(泄漏电缆)网络的高速数据通信和故障诊断,提出了一种基于多径传播的泄漏电缆网络通道模型建立方法。分析了泄漏电缆网络的多径传播和泄漏电缆的传输特性。基于多径传播,解决了网络终端之间的传递函数,建立了泄漏电缆网络的信道模型。通过将测量结果与基于模型的仿真进行比较,已成功验证了结果,很明显,仿真和测量仅在次要细节上有所不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号