XXL connection and disconnection

机译:XXL连接和断开

获取原文

摘要

For several years, the system of RTE has been handling a steadily rising number of requests for connecting new customers with photovoltaic or wind farms. Often, that is achieved by means of a branch connection to existing lines. Branch connections to lines reduce the cost of connection, but generate constraints in respect of the maintenance of structures, since the power supply to the customer cannot be maintained if the line is to be de-energised. Until now, maintenance was carried out using the dead line procedure on a part of the line after disconnecting a jumper at the branch connection pylon. That disconnecting operation is also possible in a live working situation, thanks to a specific piece of equipment called the AGD (arc guidance device, developed by Serect), which makes it possible to connect and disconnect installations up to 1.5 km, for example in 225 kV. In 2015, we pushed back the limits on connection and disconnection operations. An experiment was conducted with 225 kV on one of our structures, along with a customer with a branch connection. The aim was to isolate the part of the installation on which the work was done, while retaining service quality. A quick break disconnector and live work were used as the disconnecting tool. That solution allows switching up to 40 km, for de-energising links or switching them to no-load voltage. This experimental technique opens new vistas in a changing world, and reinforces the value of live work as a facilitator for the tasks of transmission system operators, who are faced with ever-increasing constraints. New outlook in terms of: 1. Flexibility of the maintenance schedule. 2. Innovation & Development of live working tools and procedures for connecting and disconnecting installations. 3. Exploitation & Sharing of our know-how by integrating our methods into the catalogue of RTE for national and international markets.
机译:几年来,RTE的系统已经处理一个稳步上升的数量与光伏发电或风力发电场连接新客户的请求。通常情况下,由一个分支连接到现有的生产线来实现。分支连接到线减少连接的成本,但产生的约束有关的维护结构中的,由于电源给客户不能保持如果行是要断电。到现在为止,维护进行了使用在分支连接断开塔跳线后上线的一部分死者系程序。这断开操作,也可以在现场作业的情况下,由于特定的一件装备称为AGD(ARC制导装置,通过Serect开发),这使得它能够连接和断开装置可达1.5公里处,例如在225千伏。在2015年,我们推回连接和断开操作的限制。一个实验是在我们的结构之一,225千伏进行,用树枝连接的客户一起。其目的是在其上工作已完成,同时保持服务质量安装的部分隔离开来。快速突破隔离和现场工作被用作断开工具。该解决方案允许切换到40公里,用于去激励链接或将它们切换到无负载电压。这种实验技术在不断变化的世界打开新的前景,并加强现场工作的价值作为传输系统运营商,谁正面临着不断增长的约束任务的促进者。新前景方面:1.灵活性的维修计划。 2.创新与发展的带电作业工具和用于连接和断开的安装程序。 3.开发与我们共享知识通过我们的方法纳入目录RTE的国内和国际市场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号