首页> 外文会议>International Conference on Electrical and Electronics Engineering >Solution to short term hydrothermal scheduling problem for a power system area including limited energy supply thermal units by using modified subgradient algorithm based on feasible values
【24h】

Solution to short term hydrothermal scheduling problem for a power system area including limited energy supply thermal units by using modified subgradient algorithm based on feasible values

机译:通过基于可行值的改进次梯度算法,解决供热单元有限的电力系统区域短期水热调度问题

获取原文

摘要

In this paper, the modified subgradient algorithm based on feasible values (F-MSG) is applied to a short term hydrothermal coordination problem for a power system including limited energy supply thermal units. In the proposed method, all the constraints such as units' power generation limits, transmission line capacities, bus voltage magnitude limits, hydraulic units' minimum and maximum reservoir volume limits and hydraulic units' starting and final reservoir water volumes are added into the optimization model. Actual transmission losses are inserted into the optimization model as equality constraints via load flow equations. It is also assumed that limited energy supply thermal units are fueled under take-or-pay agreement. The proposed method is tested on 16 bus test system which includes three normal thermal plants, two limited energy supply thermal plants and four serial-parallel hydraulically coupled hydro plants and better results are obtained in terms of optimal fuel cost values.
机译:本文将基于可行值的改进次梯度算法(F-MSG)应用于包含有限能量供应热单元的电力系统的短期水热协调问题。在建议的方法中,将所有约束(例如机组的发电极限,输电线路容量,母线电压幅值极限,液压单元的最小和最大储水量限制以及液压单元的开始和最终储水量)添加到优化模型中。通过潮流方程将实际的传输损耗作为等式约束插入优化模型中。还假定根据取款或付费协议为有限的能源供热单元供油。所提出的方法在16总线测试系统上进行了测试,该系统包括3个正常的热力发电厂,2个有限的能量供应热力发电厂和4个串联-并联水力耦合水力发电厂,并且在最佳燃料成本值方面获得了更好的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号