Is It Possible to Disregard Obsolete Requirements? An Initial Experiment on a Potentially New Bias in Software Effort Estimation

机译:是否可以忽略过时的要求?软件工作量估计中潜在的新偏差的初步实验

获取原文

摘要

Effort estimation is a complex area in decision-making, and is influenced by a diversity of factors that could increase the estimation error. The effects on effort estimation accuracy of having obsolete requirements in specifications have not yet been studied. This study aims at filling that gap. A total of 150 students were asked to provide effort estimates for different amounts of requirements, and one group was explicitly told to disregard some of the given requirements. The results show that even the extra text instructing participants to exclude requirements in the estimation task, had the subjects give higher estimates. The effect of having obsolete requirements in requirements specifications and backlogs in software effort estimation is not taken into account enough today, and this study provides empirical evidence that it possibly should. We also suggest different psychological explanations to the found effect.
机译:努力估计是决策中的一个复杂领域,并受可能增加估计误差的多种因素的影响。规范中过时的要求对工作量估算准确性的影响尚未得到研究。这项研究旨在填补这一空白。共有150名学生被要求提供不同数量要求的工作量估算,并且明确告知一组不考虑某些给定要求的学生。结果表明,即使是指示参与者在评估任务中排除要求的额外文本,也要使受试者给出更高的评估。如今,对需求规格书中过时的需求和积压的工作量估算的影响还没有得到足够的重视,这项研究提供了可能应该这样做的经验证据。我们还建议对发现的效果使用不同的心理学解释。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号