首页> 外文会议>International Conference on Control, Decision and Information Technologies >Methods Time Measurement on the Optimization of a Productive Process: A Case Study
【24h】

Methods Time Measurement on the Optimization of a Productive Process: A Case Study

机译:方法对生产过程优化的时间测量 - 以案例研究

获取原文

摘要

In order to maintain its competitiveness, the company object of this study identified the need for automation in the process for technological innovation. In this way, the present work sought to investigate the manual process of manufacturing meter caps of a Brazilian company in the service sector of electric energy meters and, for this purpose, analyzed the process for technological innovation, as well as its execution in the practice. The problem found in the company is the fact of the necessity of several workers to fulfil the production time, of the human being does not present constancy of production, possibility of repetitive effort injuries, among others. After due study of the process and analysis of the problem, a proposal was raised for the automation of the process. These changes imply the flexibility of the lines of production and changes in processes, which is the cause of many obstacles to productivity performance. It is the use of the Methods-Time Measurement process, a work measurement method that uses previously established times for the execution of totally Influenced by the human element, in an improvement project in a production line in the cap sector of the company's electric energy meters, seeking to eliminate losses that cause low productivity, which is compromising the fulfilment of the production plan and customer satisfaction. In the second part we will have an approach to the balance or production scheduling, its complexity and indicators to use. Continuous line implementation can bring significant benefits such as reduction of stops for adjustments 22 to 6 minutes, reduction in defects level by approximately 85%. These improvements also allowed a reduction in the number of operators from 3 shifts to 1 in a commercial shift.
机译:为了保持其竞争力,本研究的本研究目的是在技术创新过程中确定了自动化的需求。通过这种方式,目前的工作试图调查巴西公司在电能表的服务部门的制造仪表盖的手动过程,为此目的,分析了技术创新的过程,以及在实践中的执行。本公司发现的问题是若干工人履行生产时间的必要性,人类不及时持续生产,重复罚款的可能性受伤,等。在研究进程和分析问题的研究后,提出了一项提案,以便进行自动化的过程。这些变化意味着生产线的灵活性和过程的变化,这是生产率性能的许多障碍的原因。它是使用方法 - 时间测量过程,一种工作测量方法,用于执行由人类元素完全影响的先前建立的时间,在该公司电能表的盖帽部门的生产线上的改进项目中,寻求消除导致生产力低的损失,这损害了生产计划和客户满意度的实现。在第二部分中,我们将采用余额或生产调度,其复杂性和指标的方法。连续线路实现可带来显着的益处,例如减少调整22至6分钟,减少缺陷水平约为85%。这些改进也允许在商业转移中减少3班级的运营商数量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号