Accuracy assessment of the long-term hydro simulation model used in Brazil based on post-operation data

机译:基于后期数据的巴西长期水力模拟模型的准确性评估

获取原文

摘要

In the last two decades, the hydro-dominant Brazilian Power System (BPS) has been facing critical situations such as the rationing of 20% of the load during 2001/2002, and some spikes on spot market prices reaching the price cap as occurred in January 2008 and all over the years 2014 and 2015. Since the BPS is planned for a 5% risk of load shortage, the reason for these successive difficulties could be the lack of accuracy of the hydro simulation model in use for long-term operation planning studies. This paper presents a procedure for assessing the accuracy of the hydro simulation model used in the BPS based on post-operation data of the hydro plants. The procedure is based on the attempt to reproduce the verified operation over long periods of time using the water balance equations and the hydro power output functions adopted by the hydro simulation model. A case study with two hydro plants in cascade located in the São Francisco River, in the Northeast region of Brazil, has been performed. The results indicate that the simulation model in use in Brazil may be overestimating in more than 3% the hydro power output of the considered plants.
机译:在过去的二十年中,以水力为主的巴西电力系统(BPS)面临着严峻的形势,例如在2001/2002年间按负荷的20%进行配给,并且现货市场价格出现了一些峰值,达到了当时的价格上限。计划在2008年1月以及2014年和2015年全年进行。由于计划将BPS的负荷短缺风险降低到5%,因此造成这些连续困难的原因可能是长期使用的水力模拟模型缺乏准确性运营计划研究。本文提出了一种基于水电厂运行后数据评估BPS中水文模拟模型准确性的程序。该程序基于尝试使用水平衡方程和水力模拟模型采用的水力输出函数长时间重现已验证的操作的尝试。对巴西东北地区圣弗朗西斯科河的两个水电站进行了案例研究。结果表明,巴西使用的模拟模型可能高估了所考虑工厂的3%以上的水力发电量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号