Non-linear optimization of critical path method

机译:关键路径法的非线性优化

获取原文

摘要

Time and Cost Optimization (TCO) may be described as a process to identify appropriate construction activities to get the minimum duration of process and minimum additional cost which are needed. Critical Path Method (CPM) crashing project is one of methods to solve the time and cost optimization. But CPM crashing project needs some data to speed up the process business and in reality there are a lot of data which are represented using double timestamp event log. Therefore this paper represents a method to get data which are used in the crashing project. The data are obtained from average execution of activity duration in each case of event log. Then, to do the crashing project, this paper uses non-linear modeling to get minimum activity duration and minimum additional cost.
机译:时间和成本优化(TCO)可以描述为一种识别适当的施工活动的过程,以获取所需的最小过程持续时间和最小附加成本。关键路径法(CPM)崩溃项目是解决时间和成本优化的方法之一。但是CPM崩溃项目需要一些数据来加快流程业务,实际上,有很多数据是使用双时间戳事件日志表示的。因此,本文代表了一种获取在崩溃项目中使用的数据的方法。在每种情况下,从活动持续时间的平均执行中获取数据。然后,为了执行崩溃项目,本文使用非线性建模来获得最小的活动持续时间和最小的附加成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号