INNOVATIVE GROUTING TECHNIQUES FOR INSTALLATION OF A SEEPAGE BARRIER AT BARRAGE DES QUINZE DAM (QUEBEC, CANADA)

机译:在DES BAR QUINGZE DAM(加拿大魁北克)安装防渗屏障的创新灌浆技术

获取原文

摘要

The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on the dam including demolition and improvement of the roadway and spillway sections and grouting to mitigate underseepage. Initially, conventional cement grouting was attempted and was successful in 14 of the spillway sections, but unsuccessful in 5 of the sections due to the high water flows which washed the grout away. The removal of the roadway and portions of the piers during construction temporarily reduced the stability of the structure limiting grouting pressures that could be applied. This and the substantial high water flows (leakage) beneath the dam between the concrete/rock contact and within fractures in the upper rock formation created a challenging situation to create a cutoff. A grouting solution was developed that involved implementing several different grouting methods and materials including balanced high mobility grouts (HMG); low mobility grouts (LMG); polyurethane grouts; and sodium silicates. Because of the critical scheduling for the work, multiple approaches were planned and made available on site so that the work could proceed with the best technology with little, if any, time loss. The end goal of the grouting program was to create a seepage cutoff beneath the 5 sections of the dam in a stepwise process. The initial step was to fill the large openings and create a grout barrier to reduce the high water flow. The second step was to seal the contact between the base of the dam and the bedrock; and the third step was to complete closure by grouting a deep grout curtain into the underlying rock. Other features of the work included an extensive grout mix testing program, water pressure testing, borehole camera survey, and monitoring of the grout injections. Critical to the success of the project was the careful planning and execution of the hole pattern and injection sequence to minimize grout loss due to high water flows and optimize cutoff of the high flows to permit closure with a HMG grout curtain. A novel use of a sodium silicate as a setting agent together with a balanced stable cement grout proved to be a highly effective technique to stop the high water flows streamlining the operation and eliminating the need for LMG and polyurethane grout. The project was successfully completed through the winter months in northern Quebec Province using special measures to protect the work space and provide heating for grout materials for proper injection and cure. The work was completed within the required schedule to enable use of the dam gates to manage spring flows.
机译:Barrage des Quinze大坝是一个混凝土水闸大坝,由19个溢洪道段组成,每个溢洪道段大约宽7.6米,深14.5米。正在对大坝进行修复工作,包括拆除和改善巷道和溢洪道部分以及灌浆以减轻渗流。最初,尝试了常规的水泥灌浆,但在溢洪道的14个段中却成功了,但由于有大量的水流将灌浆冲走了,因此在5个段中没有成功。施工期间拆除巷道和部分墩台会暂时降低结构的稳定性,从而限制了可以施加的注浆压力。在混凝土/岩石接触面之间的大坝下方以及上部岩层的裂缝内,这以及大量的高水流(渗漏)造成了一个具有挑战性的情况,即产生了截流。开发了一种灌浆解决方案,其中涉及实施几种不同的灌浆方法和材料,包括平衡的高流动性灌浆(HMG);低流动性灌浆(LMG);聚氨酯灌浆;和硅酸钠。由于工作的时间紧迫,因此计划并在现场提供了多种方法,以便可以使用最佳技术进行工作,而不会浪费时间(如果有的话)。灌浆程序的最终目标是在大坝的5个部分下面逐步形成一个渗流截流。最初的步骤是填充大开口并创建水泥浆屏障以减少高水流。第二步是密封大坝底部和基岩之间的接触。第三步是通过将深层水泥浆灌浆到下面的岩石中来完成封闭。这项工作的其他功能包括广泛的灌浆混合测试程序,水压测试,井眼摄像机勘测和灌浆注入监控。该项目成功的关键是精心设计和执行孔型和注入顺序,以最大程度地减少因高水流量引起的灌浆损失,并优化高流量的截止值,以便使用HMG灌浆帷幕进行封闭。硅酸钠作为固化剂与平衡的稳定水泥浆一起使用的新方法被证明是一种高效的技术,可阻止高水流流线化作业,并消除了对LMG和聚氨酯浆的需要。该项目在魁北克省北部的冬季成功完成,采取了特殊措施来保护工作空间并为水泥浆材料供热,以进行适当的注入和固化。这项工作已按要求的时间表完成,可以使用坝闸来管理弹簧流量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号