首页> 外文会议>ASME international conference on ocean, offshore and arctic engineering >SCHEDULING OF OFFSHORE SUPPORT VESSELS ON THE GRAND BANKS
【24h】

SCHEDULING OF OFFSHORE SUPPORT VESSELS ON THE GRAND BANKS

机译:在大银行安排离岸支援船

获取原文

摘要

The Grand Banks off the coast of Newfoundland and Labrador present a challenging environment for the offshore oil industry. There are currently three oil producing developments, with an average distance offshore of approximately 185 nautical miles. The environment is characterized in winter by strong winds, high waves and the presence of pack ice. In the summer the area is prone to heavy fog and low visibility. Offshore support vessels are a key element of any marine based drilling and production system and they must function effectively in this environment. Their key role is to provide a timely delivery of supplies (and if necessary personnel) to and from the offshore platform. The main challenge for the existing vessels operating on the Grand Banks is that there is a high level of seasonal variation in the weather conditions between winter and summer. The research results presented in this paper were a preliminary attempt to understand the relationships between the distance offshore of the production or drilling platform, the number of supply vessels serving a platform, vessel speed, weather conditions and the required slack in the vessel schedule to provide a reliable service. This analysis was undertaken as there is significant potential for offshore development within the Flemish Pass Basin, which is even further offshore (270 nautical miles) and in a more severe winter wave regime. The results show that although the current Offshore Support Vessel fleet is satisfactory for 185 nautical miles offshore, there will need to be some changes in order to provide effective service when developments move further offshore. This may include a combination of more ships to service an offshore platform, faster ship speeds, reduced frequency of delivery, or increasing the limiting wave height for lifting operations.
机译:纽芬兰和拉布拉多沿岸的大银行为海上石油工业提供了充满挑战的环境。当前有三个产油区,离岸平均距离约为185海里。冬季的特点是大风,高浪和冰块的存在。在夏季,该地区容易出现大雾和低能见度。海上支援船是任何基于海洋的钻井和生产系统的关键要素,它们必须在这种环境下有效发挥作用。他们的关键作用是及时提供往返海上平台的物资(如有必要,还可以派遣人员)。在大银行运营的现有船舶的主要挑战是,冬季和夏季之间的天气状况存在很大的季节性变化。本文提出的研究结果是初步了解生产或钻井平台的离岸距离,服务平台的补给船数量,船速,天气状况以及提供船期所需的船期松弛之间的关系的初步尝试。可靠的服务。之所以进行此分析,是因为佛兰德关口盆地(Flemish Pass Basin)的离岸开发潜力巨大,该地区甚至更远离岸(270海里),而且在更严峻的冬季波浪状态下。结果表明,尽管当前的海上支援船舰队在185海里处令人满意,但当开发进一步向海上移动时,为了提供有效的服务,仍需要进行一些更改。这可能包括更多的船舶服务海上平台,更快的船舶速度,降低的交付频率或增加起重作业的极限波高的组合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号