Insulation coordination optimization study for ±660KV EHVDC project with increased transmission capacity

机译:输电能力提高的±660KV EHVDC工程绝缘配合优化研究

获取原文

摘要

The EHVDC transmission systems have the advantages of long-distance and high-capacity power transmission capability, in order to better play the advantages of the EHVDC transmission systems mentioned above, State Grid Corporation of China (SGCC) had proposed to increase the transmission capacity of ±660kV UHVDC transmission system, and increase the bipolar rated capacity from 4000MW to 4600MW, and the research relied on Ningdong-Shandong ±660kV EHVDC project. Based on the researched results of overvoltages in ±660kV EHVDC transmission system with the capacity of 4600MW, the insulation coordination for this transmission system is researched, and the obtained results are compared with that for ±660 kV EHVDC transmission system with the capacity of 4000MW. The content of insulation coordination includes determining insulation level of substation electrical equipment and air gap distance, and determining the line insulator configuration and air gap distance, which can provide references for the planed ±660 kV UHVDC transmission project from Xinjiang China to Pakistan, which will go into operation before 2020.
机译:EHVDC输电系统具有长距离和大容量输电能力的优点,为了更好地发挥上述EHVDC输电系统的优势,中国国家电网公司(SGCC)提出增加输电能力。 ±660kV特高压直流输电系统,将双极额定容量从4000MW增加到4600MW,该研究依靠宁山东至±660kV特高压直流输电项目。基于对容量为4600MW的±660kV EHVDC输电系统过电压的研究结果,对该输电系统的绝缘配合进行了研究,并将所得结果与容量为4000MW的±660 kV EHVDC输电系统的绝缘性能进行了比较。绝缘协调的内容包括确定变电站电气设备的绝缘水平和气隙距离,以及确定线路绝缘子配置和气隙距离,这些可为计划中的从中国新疆到巴基斯坦的±660 kV特高压直流输电项目提供参考。在2020年之前投入运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号