首页> 外文会议>International Conference on AC and DC Power Transmission >Research on optimization of valve hall grounding switches configuration in ±1100KV UHVDC converter station
【24h】

Research on optimization of valve hall grounding switches configuration in ±1100KV UHVDC converter station

机译:±1100KV特高压直流换流站阀厅接地开关配置的优化研究

获取原文

摘要

According to the design scheme of the Zhundong-Wannan ±1100kV power transmission project built this year, there are 24 grounding switches (GS) configured in the valve hall to ensure safety when maintenance. A huge investment is required due to the expensive GS and their huge volume causing a huge valve hall area. Therefore, it is necessary to optimize the grounding switches configuration (GSC) to decrease the valve hall building area and reduce the investment. In this paper, a high accurate model for GSC is established with the parameters from the design. Based on the model, valve hall residual energy distribution and release characteristics under different GSC after converter station block are investigated. The influence factors on the residual energy release characteristics are also studied. Then an optimum GSC is selected considering its comprehensive investment and its performance of discharging residual energy. The optimum GSC is Y1D1 strategy, in which two GS are installed on any phase of Y/Y and Y/D side of the converter transformer respectively.
机译:根据今年建设的准东万南±1100kV输电工程的设计方案,在阀厅内配置了24个接地开关(GS),以确保维护时的安全。由于昂贵的GS及其庞大的体积导致巨大的阀门展厅面积,因此需要巨额投资。因此,有必要优化接地开关配置(GSC),以减少气门室的建筑面积并减少投资。本文利用设计中的参数建立了高精度的GSC模型。基于该模型,研究了换流站断路后不同GSC下阀厅剩余能量的分布和释放特性。还研究了残余能量释放特性的影响因素。然后,考虑其综合投资和排放剩余能量的性能,选择一个最佳GSC。最佳GSC是Y1D1策略,其中两个GS分别安装在转换变压器的Y / Y和Y / D侧的任何相位上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号