首页> 外文会议>International Conference on AC and DC Power Transmission >Mechanism analysis and control measures of wind turbine generators tripping caused by HVDC contingencies
【24h】

Mechanism analysis and control measures of wind turbine generators tripping caused by HVDC contingencies

机译:HVDC突发事件导致风力发电机跳闸的机理分析及控制措施

获取原文

摘要

As long as the appearance and continual commission of the wind-thermal-bundled (WTB) high-voltage direct current (HVDC) transmission system, in order to ensure security and stability, it is necessary to carry out further study on the reactive power/voltage interaction among wind turbine generators (WTG), thermal generators (TG) and HVDCs. Firstly, the mechanism and corresponding measures of WTG overvoltage tripping caused by HVDC blocking are analyzed. Then, the mechanism and corresponding measures of WTG overvoltage tripping caused by HVDC commutation failure are analyzed. Finally, the mutual restriction between WTG and HVDC and the support of the TG are discussed. The results are verified by the planning Northwest China WTB HVDC transmission case system.
机译:只要风热捆绑高压直流输电系统的出现和持续调试,为确保安全性和稳定性,有必要对无功功率/风力发电机(WTG),热力发电机(TG)和HVDC之间的电压相互作用。首先,分析了由HVDC闭锁引起的WTG过电压跳闸的机理及相应的措施。然后,分析了由HVDC换相失败引起的WTG过电压跳闸的机理及相应的措施。最后,讨论了WTG和HVDC之间的相互限制以及TG的支持。规划的西北西北地区WTB高压直流输电案例系统对结果进行了验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号