首页> 外文会议>International symposium on landslides;Associazione Geotechnica Italiana >Geosynthetics layout optimization for reinforced soil slopes subject to cracks
【24h】

Geosynthetics layout optimization for reinforced soil slopes subject to cracks

机译:裂缝作用下加筋土质边坡土工布局优化

获取原文

摘要

The upper bound theorem of limit analysis is employed to investigate the effect of pre-existing cracks on the design length and distribution of geosynthetic layers in reinforced soil slopes. Two reinforcement layouts are used: uniform and linearly increasing distribution along the slope height. Compound failure mode involving pullout in some layers and tension failure (rupture) in others are considered. Results show that slopes with pre-existing cracks require longer reinforcement layers than intact ones. It emerges that for both intact and fissured slopes, a linearly increasing distribution of reinforcement yields better results than a uniform one.
机译:利用极限分析的上限定理,研究加筋土质边坡中预先存在的裂纹对土工合成层设计长度和分布的影响。使用了两种钢筋布局:沿着斜坡高度的均匀分布和线性增加分布。考虑了在某些层中涉及拔出而在其他层中涉及拉伸失效(断裂)的复合失效模式。结果表明,具有完整裂缝的斜坡需要比完整裂缝更长的加固层。结果表明,对于完整的和裂隙的斜坡,线性增加的钢筋分布比均匀的斜坡产生更好的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号