Performance Evaluation of Pier Foundation Excavations at an Existing Freeway Embankment

机译:现有高速公路路堤对码头基础挖掘的绩效评估

获取原文

摘要

The capacity of the Wuku-Yangmei section of Freeway No.1 is not sufficient to cater for developing the Taoyuan Aerotropolis. To provide more traffic lanes to the existing freeway, a series of pier foundations at its embankment are constructed for the Wuku-Yangmei Overpass which is to ease peak-hour congestion between Taipei and Taoyuan. Soil nail shoring system and an alternative shoring method with ring beam at slope portion and composite shoring system at foundation portion are applied to Piers B7 and C15, respectively, to compare their surface tension crack, lateral slope displacement, and lateral displacement-time curve. Field measurements indicate that the soil nail shoring system fails to limit slope lateral displacement leading to the extensive slope sliding incident. 3D finite element (FE) analyses using the parameters that are back-calculated by comparing the lateral displacement-depth curves to the inclinometer data have been conducted. The same parameters have been brought forward to the case of the alternative shoring. The modeling results are found to be in agreement with the field measurements and the shear strain profile may give a better understanding of the sliding surface position.
机译:高速公路的武术杨梅部分的能力不足以满足发展桃园航空科罗利者。为了为现有的高速公路提供更多的交通车道,它的堤防码头基础是为武宇的立交桥构建,这是为了缓解台北和桃园之间的高峰挤塞。土壤钉子支撑系统及其在基础部分处的斜面部分的环梁的替代脉冲脉络和替代脉冲覆盖方法分别施加到Piers B7和C15,以比较它们的表面张力裂纹,横向斜率,横向位移时间曲线。现场测量表明,土着钉子支撑系统未能限制斜坡横向位移,导致广阔的斜坡滑动入射。 3D使用通过将横向位移深度曲线与倾斜度计数据进行比较来计算的参数进行分析,有限元(FE)分析。对替代支撑的情况提出了相同的参数。发现建模结果与现场测量结果一致,剪切应变曲线可以更好地了解滑动表面位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号