首页> 外文会议>International ERP future research conference >Towards Rigid Actor Assignment in Dynamic Workflows
【24h】

Towards Rigid Actor Assignment in Dynamic Workflows

机译:在动态工作流中实现刚性角色分配

获取原文

摘要

Compared to business processes in other business domains, dynamic workflows in disaster management need a rather rigid allocation of work to actors. The work schedule must conform to available resources and their skills. Moreover, to ensure that each actor is able to quickly start working and to complete pieces of work rapidly, work must be distributed evenly. This also reduces the overall waiting time, which is an important issue in disaster management. Additionally, each actor should only have few tasks assigned at any point in time in order to be able to reliably perform critical tasks, without being overburdened. As conventional Business Process Management (BPM) tools do not fully meet these requirements, we provide an additional layer to BPM tools, the so-called Dynamic Resource Allocation (DRA) component.
机译:与其他业务领域中的业务流程相比,灾难管理中的动态工作流需要对参与者进行相当严格的工作分配。工作时间表必须符合可用资源及其技能。此外,为了确保每个演员都能快速开始工作并迅速完成工作,必须平均分配工作。这也减少了总体等待时间,这是灾难管理中的重要问题。此外,每个参与者在任何时间点都只能分配很少的任务,以便能够可靠地执行关键任务,而不会增加负担。由于常规的业务流程管理(BPM)工具不能完全满足这些要求,因此我们为BPM工具提供了另一层,即所谓的动态资源分配(DRA)组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号