Stream Restoration to Improve Slope Stability along Park Road at Gibsonville, Letchworth State Park, New York

机译:在纽约莱奇沃思州立公园的吉布森维尔进行溪流修复,以改善沿公园路的边坡稳定性

获取原文

摘要

A road to the historic Gibsonville settlement was originally aligned along the side of a steep valley slope in what would later become Letchworth State Park. Ongoing stream erosion at the toe and soil slope instability along the valley side prompted the park to place a culvert along the stream channel, cover the culvert with up to 20 feet of fill, and realign the road. After almost 40 years, stream hydraulics began causing erosion again, and the culvert showed signs of structural deterioration. Therefore the park determined that the culvert configuration needed to be remediated. A slope stability analysis indicated that excavation for replacing the culvert would require a shoring system to minimize the potential for slope movement. The dense glacial soil present at the site dictated that the shoring system would require drilled soldier piles, which was deemed cost prohibitive. Furthermore, the U.S. Army Corps of Engineers preferred that an ecologically-friendly solution be implemented. The innovative design included abandoning the culvert in-place and restoring the stream to surface flow. Elements of the design included regrading the stream valley to help slope stability, restoring a stream channel that resembled the geomorphic characteristics of nearby reference stream reaches, and building a drop structure that conveys the stream flow non-erosively to the return channel. Construction of the project was completed in 2014.
机译:通往历史悠久的吉布森维尔(Gibsonville)定居点的道路原本是沿着陡峭的山谷边坡排列的,后来变成了莱奇沃思州立公园。脚趾处持续的溪流侵蚀和山谷一侧的土壤坡度不稳定性促使公园在溪流通道上放置一个涵洞,用最多20英尺的填土覆盖涵洞,并重新调整道路。在将近40年之后,溪流水力又开始引起侵蚀,并且涵洞显示出结构恶化的迹象。因此公园确定需要修复涵洞配置。边坡稳定性分析表明,为更换涵洞而进行的开挖将需要一个支撑系统,以最大程度地减少边坡移动的可能性。现场存在的致密冰河土壤表明,支撑系统将需要钻孔士兵桩,这被认为是成本高昂的。此外,美国陆军工程兵团更希望实施一种生态友好的解决方案。创新的设计包括就地放弃涵洞,并将水流恢复为地面水流。设计的要素包括改建河谷以帮助边坡稳定,恢复类似于附近参考河流的地貌特征的河道,以及建造将水流非侵蚀性地输送到返回河道的降落结构。该项目的建设已于2014年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号