首页> 外文会议>Human Factors and Ergonomics Society;Human Factors and Ergonomics Society annual meeting >Workload Associated with Nuclear Power Plant Main Control Room Tasks
【24h】

Workload Associated with Nuclear Power Plant Main Control Room Tasks

机译:与核电厂主控制室任务相关的工作量

获取原文

摘要

Nuclear Power Plant (NPP) operators complete a variety of tasks to ensure the NPP is running safely andefficiently. However, the levels and types of workload associated with the different task types are not yet fullyunderstood. The present investigation examined workload levels and types for three common NPP Main ControlRoom (MCR) tasks in a controlled experimental environment using a variety of subjective, physiological, andperformance measures of workload. The results suggest that the three task types differ in the levels and types ofworkload. These findings can be used to better understand the types of NPP tasks that induce workload and thetype of workload they induce. The full results of these experiments will be captured in future articles andtechnical reports.
机译:核电厂(NPP)运营商完成各种任务,以确保NPP安全运行并 有效率的。但是,与不同任务类型相关联的工作负载的级别和类型尚未完全 了解。本调查研究了三种常见的NPP主控制的工作量级别和类型 在受控的实验环境中使用各种主观,生理和生理上的室(MCR)任务 工作量的绩效指标。结果表明,三种任务类型的级别和类型有所不同。 工作量。这些发现可用于更好地理解导致工作量减少的NPP任务的类型以及 他们带来的工作量类型。这些实验的全部结果将在以后的文章中介绍,并且 技术报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号