GROUND IMPROVEMENT FOR UNDERGROUND CONSTRUCTION IN SOUTH FLORIDA

机译:南佛罗里达州地下建筑的地面改造

获取原文

摘要

The demand for underground parking in South Florida has increased as a result of changes to the local building code, coupled with developers' desire to improve building aesthetics and provide much needed walk in retail space for high-end structures. Historically, underground construction was uncommon in South Florida due to the high groundwater level and porous soil/rock. Conventional dewatering methods become ineffective only a short depth below the ground surface and deeper excavations have required a tremie seal solution consisting of wet excavation and the pouring a temporary unreinforced slab under a water head. However, as excavation area and depth increase, the cost and schedule of the tremie seal method become problematic. For these reasons developers and construction teams alike have looked to contractors in South Florida for alternative means of construction. This paper details the construction of two sites in South Florida where Deep Soil Mixing (DSM) technology offered an efficient alternative to tremie seal construction. The Brickell City Centre required excavation of 8 acres to depths of 30 feet, and augercast piles up to 36" diameter and 110 feet in depth. The second site, Jade Signature, required an excavation of up to 41 feet directly adjacent to the Atlantic beachfront. Due to the concerns over differential settlement, the project featured a soil mixed gravity wall that was designed and installed to allow for completion of the tower prior to excavating the adjacent garage. Both projects involved improving every square inch of ground beneath the planned project excavation. The developed DSM seal slab solution creates a nearly impervious excavation at excavation invert with the strength to resist hydrostatic uplift forces. Low permeability site perimeter walls are constructed to complete the sealed excavation and reinforced with either beams or sheet piles for structural support. Augercast piles required for the permanent hydrostatic concrete slab supplement the uplift capacity of the DSM. After DSM and augercast piles are installed from grade, the site is excavated in dry conditions.
机译:由于更改了当地的建筑规范,加上开发商希望改善建筑的美感并为高端建筑提供在零售空间中急需的步行空间,南佛罗里达州地下停车场的需求有所增加。从历史上看,由于高地下水位和多孔土壤/岩石,南佛罗里达州的地下建筑很少见。常规的脱水方法仅在地下以下一小段时间内无效,而较深的开挖则需要采用特雷姆密封解决方案,包括湿法开挖和在水头下方浇筑临时的无筋板。然而,随着开挖面积和深度的增加,特雷米海豹密封方法的成本和进度变得成问题。由于这些原因,开发人员和施工团队都向南佛罗里达州的承包商寻求替代施工方法。本文详细介绍了南佛罗里达州的两个站点的建设,在该站点中,深层土壤混合(DSM)技术为特雷姆海豹的建造提供了一种有效的替代方法。布里克尔市中心需要开挖8英亩的深度为30英尺,而直径达36英寸,深度为110英尺的螺旋钻桩。第二个场所,翡翠签名(Jade Signature),需要在紧邻大西洋海滩的位置进行高达41英尺的挖掘。 。由于对差异沉降的担忧,该项目采用了土质混合重力墙,该墙的设计和安装是为了在开挖相邻的车库之前完成塔的建设。 。研发的DSM密封板解决方案可在开挖时产生几乎不透水的开挖,并具有抵抗静水压力的作用,低渗透现场围墙可完成密封开挖,并通过梁或板桩进行加固以进行结构支撑。永久静水混凝土板所需的压力补充了DSM的提升能力。并按等级安装螺旋桩,并在干燥条件下进行挖掘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号