TWO-YEAR PERFORMANCE COMPARISON ASSESSMENT BETWEEN CENTRAL AND- MULTISTRING-BASED INVERTERS INSTALLED IN LARGE-SCALE PHOTOVOLTAIC POWER STATIONS IN GREECE

机译:在希腊大型光伏电站中安装的基于中央和多级逆变器的两年性能比较评估

获取原文

摘要

In the last year's 29th EU PVSEC, the authors presented a one-year real-life performance behaviour assessment of the two main inverter technologies used in large-scale grid connected PV Power Stations (PPS). This paper is intended to present a full two-year performance comparison between central and multistring inverters. In this context, the main purpose of this research study is to provide an updated comprehensive assessment of performance advantages and disadvantages of the inverter technologies under examination. This shall be effect by applying the second year's data in the comparison assessment and by re-evaluating the first year's results. The comparison assessment will use a full two year real-life data derived from the operation of two 500kWp grid-connected PPS, located close to the city of Lamia in Central Greece. Both PPS are designed, installed and maintained by the same EPC contractor. The same type of polycrystalline modules is used, adopting also the same panel tilt and shading angle. At the same time however, PPS "A" is based on the operation of one central inverter, while PPS "B" uses 25 multistring inverters. The inverters used in both parks are supplied from the same manufacturer. In this way, the technical design features and the adjacent location of the two PPS enable in depth analysis via the direct comparison of the inverters' performance indices as proposed by the IEC 61724 international standard. Through analysis of the monitored data, the results indicate a small advantage for the central configuration. Further to that, the list of each system's advantages and disadvantages was updated. Monitoring will be continued and a more detailed insight on the overall performance of the two PPS will be reported in the future.
机译:在去年的第29届欧盟PVSEC中,作者对大型并网光伏电站(PPS)中使用的两种主要逆变器技术进行了为期一年的实际性能评估。本文旨在对中央和多串逆变器进行为期两年的完整性能比较。在这种情况下,本研究的主要目的是对所检查的逆变器技术的性能优缺点提供最新的综合评估。这应通过在比较评估中应用第二年的数据并重新评估第一年的结果来实现。比较评估将使用从希腊中部拉米亚市附近的两个500kWp并网PPS的运行中获得的为期两年的完整真实数据。两种PPS均由同一EPC承包商设计,安装和维护。使用相同类型的多晶组件,也采用相同的面板倾斜度和阴影角。但是同时,PPS“ A”基于一个中央逆变器的运行,而PPS“ B”使用25个多串逆变器。两个园区中使用的逆变器均由同一制造商提供。这样,两个PPS的技术设计特征和相邻位置就可以通过直接比较逆变器的性能指标(如IEC 61724国际标准所建议的)来进行深度分析。通过对监视数据的分析,结果表明中心配置的优势很小。除此之外,还更新了每个系统的优缺点列表。监控将继续进行,将来将报告有关这两个PPS总体性能的更详细的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号