MACDONALD BRIDGE SUSPENDED SPANS DECK REPLACEMENT: ENGINEERING CHALLENGES AND SOLUTIONS – IN-PROGRESS UPDATE

机译:麦克唐纳德大桥悬吊式甲板更换:工程方面的挑战和解决方案–进展中的更新

获取原文

摘要

The Angus L. Macdonald Bridge is a major suspension bridge that crosses Halifax Harbour in Halifax,Nova Scotia, Canada. The deck of the suspended spans has reached the end of its functional life andfabrication of deck segments for a deck replacement scheme is under way. Construction will span 2015 -2017. On this project, a variety of significant engineering challenges have been encountered because ofthe complexity of replacing the deck at night with the bridge open to traffic during the day and because thedesign engineers have prepared the scheme of the deck erection sequence. This approach has beenadopted to streamline the construction process and lower overall project risk. Main cable dehumidificationis being installed on the project.
机译:安格斯·麦克唐纳大桥(Angus L. Macdonald Bridge)是横跨哈利法克斯(Halifax)哈利法克斯港口(Halifax Harbour)的主要悬索桥, 加拿大新斯科舍省。悬挂跨度的甲板已达到其使用寿命,并且 用于甲板更换方案的甲板段的制造正在进行中。建设时间跨度为2015年- 2017年。在这个项目上,由于 晚上用桥通车的夜晚更换甲板的复杂性,因为 设计工程师已经准备了甲板安​​装顺序的方案。这种方法已经 通过简化施工过程并降低总体项目风险。主电缆除湿 正在安装在项目上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号