首页> 外文会议>International Conference on Structural Mechanics in Reactor Technology >EXPERIENCES AND FIRST RESULTS OF THE OL3 INNER CONTAINMENT IN-SERVICE INSPECTION SYSTEM
【24h】

EXPERIENCES AND FIRST RESULTS OF THE OL3 INNER CONTAINMENT IN-SERVICE INSPECTION SYSTEM

机译:OL3内在维修检查系统的经验和第一结果

获取原文

摘要

The prestressed Inner Containment of the OL3 EPR in Olkiluoto, Finland is equipped with an In-service Inspection (ISI) system. The inspection plan comprises the schedule for measurements at specified intervals during the containment operation time as well as criteria for assessment. The measurement results of the Initial Structural Integrity Test (ISIT) are decisive as precondition for the plants commissioning. The present paper describes the instrumentation and the evaluation of the measurement results since the installation of the ISI system. Valuable knowledge has already been gained in the prestressing phase by monitoring the containment deformations during tensioning of the different tendon groups. The comparison to precalculated results is illustrated. Since then, the long term deformation development has been pursued. The evaluation permits first assessments of the containment ageing behaviour. The applied prestressing system and the material parameters are elucidated as main influencing factors of concrete creep and shrinkage. Concerning the ISIT the ISI system requirements are illuminated. Results are indicated and compared to design calculation values.
机译:芬兰奥尔基卢托(Olkiluoto)的OL3 EPR预应力内部安全壳配备了运行中检查(ISI)系统。检验计划包括在围护操作时间内按指定间隔进行测量的时间表以及评估标准。初始结构完整性测试(ISIT)的测量结果具有决定性意义,是设备试运行的前提。本文介绍了自安装ISI系统以来的仪器和测量结果的评估。在预应力阶段,通过监测不同的筋束张紧过程中的安全壳变形,已经获得了宝贵的知识。说明了与预先计算的结果的比较。从那时起,就一直追求长期的变形发展。该评估允许对安全壳老化行为进行首次评估。阐明了所应用的预应力系统和材料参数是影响混凝土蠕变和收缩的主要因素。关于ISIT,ISI系统要求已阐明。显示结果并将其与设计计算值进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号