首页> 外文会议>Coat international conference of transportation professionals >Analyzing Method of Setting Threshold of Integrated Bus Stops for Regular Public Transit and Bus Rapid Transit
【24h】

Analyzing Method of Setting Threshold of Integrated Bus Stops for Regular Public Transit and Bus Rapid Transit

机译:常规公共交通和总线快速公交站集成总线停止阈值的分析方法

获取原文

摘要

Bus rapid transit (BRT) bus stops sometimes are set up as integratedbus stops, which provide services for both regular public transit and bus rapid transit.To guarantee thespeedinessof BRT, this paper studiesintegrated bus stops, and analyzes queuing delays of BRT vehicles at exclusive and integrated bus stops with Queuing Theory first. Considering the effect of buses'arrival and passengers' getting on and off buses on buses'delay, this paper calculatesstopping delay of BRT vehicles at bus stops, and builds atotal delay model of BRT vehicles. Takingtotal delay of BRT vehicles at exclusive bus stops as standard, and comparing total delays of BRT vehicles at exclusive and integrated bus stops, this paper proposesa analyzing method of setting threshold forintegrated bus stops.Then, this paper usesaexclusive bus stop as an example toverify feasibility of the method. The method guarantees priority of BRT, and provides theoretical support for setting upintegrated bus stops.
机译:总线快速运输(BRT)公交车站有时被设置为SideverBus停止,为常规公共交通和总线提供服务,为BRT保证,本文研究了BRT,并分析了BRT车辆的排队延迟集成的巴士首先与排队理论站停止。考虑到公共汽车和乘客在公交车上坐下的公共汽车的影响,公交车站BRT车辆的纸张计算延迟,并建立了BRT车辆的地延迟模型。独家巴士的BRT车辆的投掷延迟作为标准,并比较了BRT车辆在独家和集成总线停止时的总延误,本文提出了设定阈值的分析方法,设置阈值的传动总线停止。该纸张使用额定公交车作为示例旨在实现可行性的示例该方法。该方法保证了BRT的优先级,并提供了对设置上升的总线站的理论支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号