首页> 外文会议>International conference on cold regions engineering >Cold Weather Integrity Dig on a Scenic River, Northern Michigan
【24h】

Cold Weather Integrity Dig on a Scenic River, Northern Michigan

机译:在密歇根州北部风景秀丽的河上开挖的寒冷天气完整性

获取原文

摘要

A pipeline integrity dig was recently completed during the early winter months of 2013 in the Upper Peninsula of Michigan. In addition to snowfall, extreme temperatures, and difficult access, the integrity investigation required excavation within a designated National Wild and Scenic River flowing into Lake Superior. The integrity investigation required an excavation 9 feet deep and 16 feet in length to expose a section of 30 inch pipeline. The excavation extended out approximately two thirds of the way into the river, requiring several design considerations and extensive environmental permitting. During the initial design phase, two main methods were evaluated for excavation support and river diversion, including sheet piling and cofferdams with trench box support. Due to the high gravel and cobble content of the riverbed, sheet piling was ruled out, and a HEC-2 water profile analysis program was utilized to predict the water elevations of varying storm events for cofferdam placement. Upon completion of design, permitting was approved over the next 12 months by seven different government agencies. The final approval was received in late 2012, and mobilization to the project site commenced in early 2013 due to the nature of the integrity investigation. The contractor, United Piping Inc., completed the project safely and successfully while dealing with temperatures ranging from -18 to 42 degrees Fahrenheit, with wind chills dropping to -42 degrees Fahrenheit. This paper details the initial site evaluation, conceptual plans, hydraulic design, and environmental permitting, as well as the unique construction techniques and safety practices employed to successfully complete the project.
机译:最近在密歇根州上半岛的2013年初冬季完成了管道完整性挖掘工作。除了降雪,极端温度和难以进入之外,完整性调查还要求在流入苏必利尔湖的国家野生和风景秀丽的河流中进行挖掘。完整性调查要求开挖9英尺深,16英尺长,以露出一段30英寸的管道。开挖延伸到河中约三分之二的距离,需要进行一些设计考虑并获得广泛的环境许可。在初始设计阶段,评估了两种主要的开挖支护和引水方法,包括板桩和带沟箱支护的围堰。由于河床中的砾石和卵石含量较高,因此排除了板桩,并使用了HEC-2水剖面分析程序来预测围堰放置过程中各种风暴事件的水位。设计完成后,七个不同的政府机构在接下来的12个月中批准了许可。由于诚信调查的性质,最终批准已于2012年底获得批准,并于2013年初开始动员到项目现场。承包商United Piping Inc.安全,成功地完成了该项目,同时处理的温度范围为-18至42华氏度,而风寒降至-42华氏度。本文详细介绍了初步的现场评估,概念计划,水力设计和环境许可,以及成功完成项目所采用的独特施工技术和安全实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文