首页> 外文会议>International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology >Recloser-fuse coordination improvement for distributed generation installed capacity enhancement in electrical distribution systems
【24h】

Recloser-fuse coordination improvement for distributed generation installed capacity enhancement in electrical distribution systems

机译:重合闸-熔断器协调改进,以增强配电系统中的分布式发电装机容量

获取原文

摘要

This paper presents a new strategy for improving recloser-fuse coordination to enhance distributed generation (DG) installed capacity in medium voltage distribution systems. The proposed algorithm could be used to solve recloser-fuse miscoordination problems based on fuse-saving principles. Moreover, it can increase power transfer capability from DG to load by changing the time dial of the recloser and fuse size simultaneously. This algorithm considers many conditions such as fault locations, DG types, DG locations and DG sizes. The proposed algorithm has been implemented in the practical 22 kV Mae Sariang distribution system of the Provincial Electricity Authority of Thailand (PEA)using DIgSILENT Power Factory software. The test results showed that the proposed method could be used to improve recloser-fuse coordination with a suitable time dial of the recloser and fuse size, resulting in the maximum capacity of DG connected at any location in the distribution system.
机译:本文提出了一种新的策略,用于改善重合闸熔断器的协调性,以增强中压配电系统中的分布式发电(DG)装机容量。该算法可用于基于熔丝节省原理的重合闸熔丝配位问题。此外,通过同时改变重合器的时间刻度和保险丝尺寸,可以提高从DG到负载的功率传输能力。该算法考虑了许多条件,例如故障位置,DG类型,DG位置和DG大小。使用DIgSILENT Power Factory软件,已在泰国省电力局(PEA)的实际22 kV Mae Sariang配电系统中实现了所提出的算法。测试结果表明,所提出的方法可用于通过适当的重合闸时间刻度和保险丝尺寸来改善重合闸熔断器协调性,从而在配电系统中的任何位置实现最大容量的DG连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号