首页> 外文会议>IEEE GCC Conference and Exhibition >Main criteria in interconnection of generating units to islanded grids, Salalah IPP2 case study
【24h】

Main criteria in interconnection of generating units to islanded grids, Salalah IPP2 case study

机译:Salalah IPP2案例研究:发电机组与孤岛电网互联的主要标准

获取原文

摘要

In each islanded grids, a number of technical rules and recommendations need to be followed in operation ensuring smooth operation of the system and to enable grid disturbances to be controlled. These technical rules and recommendations, however, give the operators the option of going beyond mere compliance with these minimum requirements, implementing more stringent requirements or even defining these in details. In this paper, main criteria and rules, which should be considered in interconnection power plants to the islanded grids, are reviewed. One of the criteria, that is a main concern of system planners and operators, is frequency deviation limits and required spinning reserve to diminish it. In this paper, as a case study, technical criteria in Power evacuation system of IPP2 power plant to Salalah grid (DPC, Oman) are discussed.
机译:在每个孤岛电网中,在运行中都需要遵循许多技术规则和建议,以确保系统的平稳运行并控制电网干扰。但是,这些技术规则和建议使操作员可以选择不仅仅遵守这些最低要求,实施更严格的要求,甚至详细定义这些要求。在本文中,审查了在与孤岛电网互联的发电厂中应考虑的主要标准和规则。系统规划人员和操作人员主要关注的标准之一是频率偏差限制和所需的旋转储备以减少频率偏差。本文以案例研究为基础,讨论了IPP2发电厂至Salalah电网(阿曼DPC)的电力疏散系统的技术标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号