首页> 外文会议>International conference on transportation engineering >A SIMULATION MODEL AND ALGORITHM FOR TURMNG-BACK CAPACITY OF INTERCITY DEDICATED PASSENGER RAILWAY STATION
【24h】

A SIMULATION MODEL AND ALGORITHM FOR TURMNG-BACK CAPACITY OF INTERCITY DEDICATED PASSENGER RAILWAY STATION

机译:一种仿真模型与跨越乘客火车站的Turmng-Back容量算法

获取原文

摘要

Intercity Passenger Dedicated Line has considerable passenger flow volume in peak hours, and the carrying capacity of stations is seriously affected by the long detention time of turning-back trains. In order to meet maximum parallel routing problem and solve routing conflict, the paper abstracts track layout into a network with poly-source and poly-terminal and proposes graph and network method based on minimum-cost and maximum-flow to create a mathematical model and finally establishes next-case step algorithm. The practical simulation indicates that results are reasonable and this system is suitable for the calculation of railway station capacity.
机译:跨度乘客专用线在高峰时段具有相当大的乘客流量,并且电站的承载能力受转轮训练的长期拘留时间的严重影响。为了满足最大的并行路由问题并解决路由冲突,纸张摘要将跟踪布局与多源和多终端进行网络,并提出基于最小成本和最大流量的图形和网络方法来创建数学模型和最后建立下一个情况步骤算法。实际模拟表明,结果合理,该系统适用于计算火车站的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号