Cascade hydroelectric scheme: River flow estimation for reservoir regulation improvement and flood-risk mitigation

机译:梯级水电计划:估算河水流量以改善水库调度和减轻洪灾风险

获取原文

摘要

Due to present and imminent extreme weather patterns, regulation of hydroelectric reservoirs and flood risk management requires better measurement of river flows. To improve reservoir regulation at our hydroelectric scheme in northern part of Malaysia, a budget river flow measurement system have been installed to estimate flows of rivers that fed four of our hydroelectric reservoirs. The main goal of this measurement system is to estimate water flows into four cascade hydroelectric reservoirs using fore-bay and tail race water levels alone as sensors. With limited number of level sensors installed, mathematical computations have been used to estimate incoming cascade flows. The computation is based on mass balance that volumes of incoming flows should be equal to water stored in the reservoirs over a period plus volumes of water discharge from these hydroelectric plants. The volumes are obtained by integration of flows over selected intervals. However, computation of water volume stored in reservoirs can yield a temporary drift result due to resolution error associated with fore-bay water level measurement that has smallest measured change of 0.01m. These volume computations can causes significant errors as the level variations will be amplified by large surface areas of the reservoirs. Although this measurement system has been able to perform as anticipated, further refinements are needed including to estimate water flow travel times between different reservoir systems. Also, as the lowest level of cascaded hydroelectric stations has limited capacity (due to historical background and construction cost) that spillage is often occur, this proposed system can be used in the future to improve its energy output, in addition to reduce risks of flooding downstream.
机译:由于当前和迫在眉睫的极端天气模式,水电水库的调节和洪水风险管理需要对河流流量进行更好的测量。为了改善我们在马来西亚北部的水力发电计划中的水库监管,已安装了预算河流量测量系统,以估算为我们的四个水力水库供水的河流流量。该测量系统的主要目标是仅使用前湾和尾流水位作为传感器来估算流入四个梯级水力发电库的水量。在安装了有限数量的液位传感器的情况下,已经使用数学计算来估计传入的级联流量。该计算基于质量平衡,即流入的量应等于一段时间内存储在水库中的水加上这些水力发电厂排出的水量。通过对选定时间间隔内的流量进行积分来获得体积。但是,由于与前湾水位测量相关的分辨率误差(最小测量变化为0.01m)而导致的分辨率误差,计算存储在水库中的水量可能会产生暂时的漂移结果。这些体积计算可能会导致重大错误,因为液位变化会被储层的大表面积放大。尽管该测量系统已能够按预期执行,但仍需要进一步完善,包括估算不同水库系统之间的水流传播时间。此外,由于最低的梯级水电站容量有限(由于历史背景和建筑成本),经常发生溢漏,因此,该提议的系统可在将来用于改善其能源输出,同时降低洪水风险下游。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号