【24h】

Prioritization and ranking of ERP testing components

机译:ERP测试组件的优先级和排名

获取原文

摘要

Software Testing is one of the most important activities but more often than not attracts less attention than it deserves in software development and implementation. It often takes twenty to sometimes even more than fifty percent of the total software development time. Enterprise Resource Planning (ERP) Systems provide synergy by integrating all operations of an enterprise. So implementation of ERP systems need even more rigorous testing than that employed in stand-alone software development. Software testing is a well-researched area but software testing as employed on ERP systems albeit is droughted with respect to research. This research paper is an extension of the patent by Kapur et al.[8] that identified the ERP Testing Components to measure ERP testing efficiency. Here, the ERP Testing Components have been accumulated and categorized under five heads. Thereafter, these testing components have been prioritized and ranked with the help of Analytic Hierarchy Process (AHP), as given by Saaty [17].
机译:软件测试是最重要的活动之一,但往往引起的关注比在软件开发和实施中应有的关注少。通常需要花费总软件开发时间的百分之二十甚至有时超过百分之五十。企业资源计划(ERP)系统通过集成企业的所有运营来提供协同作用。因此,与独立软件开发相比,ERP系统的实施甚至需要更严格的测试。软件测试是一个研究很广的领域,但是ERP研究中使用的软件测试尽管在研究方面比较枯燥。该研究论文是Kapur等人[8]对专利的扩展。确定了用于衡量ERP测试效率的ERP测试组件。在这里,ERP测试组件已被汇总并归类为五个类别。此后,如Saaty [17]所述,这些测试组件已被优先排序,并借助层次分析法(AHP)进行了排名。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号