首页> 外文会议>International Symposium on Frontiers in Offshore Geotechnics >Review of pile driving results for the Maui and Maari developments in the Taranaki basin of New Zealand
【24h】

Review of pile driving results for the Maui and Maari developments in the Taranaki basin of New Zealand

机译:新西兰塔拉纳基盆地毛伊岛和毛原发展的初期促销促销成果

获取原文

摘要

The Taranaki basin is currently New Zealand's only commercial hydrocarbon producing basin and is of significant economic interest to the islands. However, its remoteness demands that offshore construction is carefully planned and engineered to avoid costly change-outs or delays arising from mobilising unsuitable or inefficient equipment. Piling issues such as premature refusal occurred during installation of the Maui A platform which is regarded as NZ frontier offshore project. This paper re-examines the Maui A driving records together with those from the more recent Maui B and Maari developments to help improve our understanding of pile driving behaviour in this region. Different approaches for estimating the soil resistance to driving (SRD) are assessed and compared with back-analysed field data. Recommendations are made for future predictions of SRD and hammer selection based on the accumulated experience at the three sites.
机译:Taranaki Basin目前是新西兰唯一的商业碳氢化合物生产盆地,对岛屿具有重要的经济兴趣。然而,其远程性要求仔细规划和工程设计,以避免昂贵的改变或延迟动员不合适或低效的设备。在安装毛伊岛的平台期间发生了早熟拒绝等打桩问题,该平台被视为NZ Frontier海上项目。本文重新审视了毛伊岛的驾驶记录以及最近的毛伊岛和Maari的发展,以帮助提高我们对该地区的桩驾驶行为的理解。评估并与后分析现场数据进行评估和比较估算驾驶抗驾驶(SRD)的不同方法。基于三个地点的累积经验,对SRD和锤子选择的未来预测进行了建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号