首页> 外文会议>Deep Foundations Institute annual conference on Deep Foundations >METRO SAO PAULO, LINE 5, FIVE SHAFT DIAPHRAGM WALL FOR BROOKLIN STATION
【24h】

METRO SAO PAULO, LINE 5, FIVE SHAFT DIAPHRAGM WALL FOR BROOKLIN STATION

机译:地铁5号线地铁圣保罗,布鲁克林站的五轴横隔膜墙

获取原文

摘要

Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. Of course they can also be used as deep groundwater barriers. This paper will focus on the construction work in an urban area like Sao Paulo. The Line 5 of Metro Sao Paulo is one of four network expansion projects undertaken at the same time. The projects will cover various areas of the city. The Line 5 on Sao Paulo's south-side will be extended 7.1mi (11.5km) to serve 770,000 riders per day, stretching a total of 12.4mi (19.9km) along 17 stations. The extension line will facilitate access to the city's central section and the commercial and hospital districts located along the line. The Brooklin Station, subject of this paper, had to be carried out in a special five shaft shape design, shaft diameter 131ft (40m) each, without using ground anchors. A focus will be taken on the special requirements of the installation of the arrows as well as on the specialties of installation for the shaft shaped layout. Therefore, it was required to install a 3.3ft (1,000mm) diaphragm wall using a specific layout especially in the connecting sections of the shafts, the so called arrows, to provide a bearing area for the struts. Maximum wall depth was about 121ft (37m); the total volume was about 20,060 cubic yard (15,337m~3). The paper will describe the construction method and the sequence of activities required for the construction of this diaphragm wall using a combination of hydraulic grab and trench cutter system.
机译:隔膜墙被称为地下结构元件,通常用于固位系统和永久性基础墙或元件。当然,它们也可以用作深层地下水屏障。本文将重点关注圣保罗等城市地区的建筑工作。圣保罗地铁5号线是同时进行的四个网络扩展项目之一。这些项目将覆盖城市的各个地区。圣保罗南侧的5号线将延长7.1英里(11.5公里),每天为770,000名车手提供服务,并沿17个车站延伸了12.4英里(19.9公里)。延长线将方便前往城市的中部以及沿线的商业和医院区。本文的主题布鲁克林站必须采用特殊的五轴形状设计进行,每个轴直径131ft(40m),而无需使用地面锚。将重点关注箭头安装的特殊要求以及轴形布局的安装特殊性。因此,需要使用特定的布局来安装3.3英尺(1,000毫米)的隔膜墙,尤其是在轴的连接部分(即所谓的箭头)中,以为支杆提供支撑区域。最大壁深约为121英尺(37m);总容积约为20,060立方码(15,337m〜3)。本文将描述使用液压抓斗和沟槽切割机系统组合建造这种隔膜墙的施工方法和活动顺序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号