Experience of Partial Discharge with IEC Type Testing and after Installation Testing for extruded Cables

机译:通过IEC类型测试和挤压电缆安装后测试进行局部放电的经验

获取原文

摘要

Partial Discharge (PD) measurement methods are most important and preferred in testing of underground high voltage cables and they have received much attention in recent years. Apparent charge, partial discharge inception voltage as well as number and distribution of PD pulses are most important quantities for the determination of the insulation quality. This paper described experiences of PD measurements with AC resonant voltages in Extra High Voltage Research Centre (EHVRC) laboratory according to IEC standards and after installation test of installed XLPE HV and EHV single core underground cable systems. The paper outlines the difference between PD measurements performed on individual components in the laboratory and PD measurements performed on installed systems in the after installation with respect to magnitude calibration of PD pulses. Fact is that all the power cables are tested in the laboratory with the best methods and with calibrated PD measuring systems in the shielded room with high sensitivity; as a result the background noise level is less than 2 pC. A general principle of the insulation co-ordination and HV testing is that the applied test voltage simulates the stresses which occur during the operation of the HV apparatus. Successful measurements give fingerprint for further diagnostics during the service of the cable system. Tell now for after installation test, PD measurements are actually not required by IEC 60840 &IEC 62067, but the testing experience more than 12 years shows a population of extrude cable systems subjected to a combination of AC testing and PD measuring acceptance testing. This paper summarizes the experiences of on-site testing and the obtained results are compared with the IEC type tests. One important conclusion of this paper is modifications of IEC 60840 & IEC 62067 are required to evaluate the on-site after installation testing for extruded cables.
机译:在地下高压电缆的测试中,局部放电(PD)测量方法是最重要和首选的方法,并且近年来受到了广泛的关注。视在电荷,局部放电起始电压以及PD脉冲的数量和分布对于确定绝缘质量最重要。本文介绍了根据IEC标准在超高压研究中心(EHVRC)实验室中使用交流谐振电压进行PD测量的经验,以及对已安装的XLPE HV和EHV单芯地下电缆系统进行安装测试之后的经验。本文概述了在实验室中单个组件上进行的PD测量与安装后在已安装系统上进行的PD测量之间在PD脉冲幅度校准方面的区别。事实是,所有的电源线都在实验室中以最佳的方法进行了测试,并在屏蔽室内以高灵敏度使用了经过校准的PD测量系统;结果,背景噪声水平小于2 pC。绝缘配合和HV测试的一般原理是所施加的测试电压模拟在HV设备运行期间出现的应力。成功的测量为在电缆系统维修期间的进一步诊断提供了指纹。现在说说安装后的测试,实际上IEC 60840&IEC 62067并不需要进行PD测量,但是超过12年的测试经验表明,大量挤出电缆系统经过了AC测试和PD测量验收测试的组合。本文总结了现场测试的经验,并将获得的结果与IEC类型测试进行了比较。本文的一个重要结论是,需要对IEC 60840和IEC 62067进行修改,以对挤压电缆的安装测试后的现场评估进行评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号