Impact of QA/QC on the Successful Commissioning of Long 380 kV XLPE

机译:质量检查/质量控制对380 kV长XLPE成功调试的影响

获取原文
获取外文期刊封面目录资料

摘要

To strengthen the Dutch EHV transmission system, TenneT TSO B.V. has recently completed a mixed 380 kV transmission system. About 130 km single phase XLPE cable was installed, including 132 joints and 24 cable terminations. Unlike many underground cable connections, the cable circuits form an important connection within the multi-ring structured Dutch transmission network, resulting in high demands regarding reliability and capacity. Extra attention to the quality assurance and quality control (QA/QC) procedures was inevitable to ensure the required reliability of the cable systems.From the start of the project onwards, QA/QC measures were focused on. This led first of all to specific requirements in the definition phases of the project and to attention to the manufacturing and related testing phases in the project. Given the large number of accessories, specific choices were made, and given the result of initial sample tests, a statistical analysis was made towards the reliability of the cable accessories. This resulted in a sufficiently proven reliability of all materials for the project.A second series of QA/QC works was related to the installation of the cable system. Risks were identified and lead to the introduction of risk based quality control into the project. As a result, a set of dedicated risk mitigation plans were defined and implemented in the project.Finally, the system has been completed and has successfully passed the SAT (374 kV for 60 minutes) with online partial discharge measurements on all accessories. No irregularities in the quality of the finalized large sized 380 kV cable systems were indicated.
机译:为了加强荷兰的超高压输电系统,TenneT TSO B.V.最近完成了一个380 kV混合输电系统。安装了约130 km的单相XLPE电缆,包括132个接头和24个电缆终端。与许多地下电缆连接不同,电缆电路在多环结构的荷兰传输网络中形成了重要的连接,因此对可靠性和容量提出了很高的要求。为了确保电缆系统所需的可靠性,不可避免地要特别注意质量保证和质量控制(QA / QC)程序。 从项目开始起,就着重于质量保证/质量控制措施。首先,这导致了项目定义阶段的特定要求,并引起了对项目制​​造和相关测试阶段的关注。鉴于附件数量众多,因此做出了特定选择,并给出了初始样本测试的结果,并对电缆附件的可靠性进行了统计分析。这样就为该项目的所有材料提供了充分证明的可靠性。 QA / QC工作的第二系列涉及电缆系统的安装。识别风险并导致将基于风险的质量控制引入项目。结果,在项目中定义并实施了一套专用的风险缓解计划。 最终,该系统已经完成,并成功通过了SAT(374 kV,60分钟),所有附件均在线进行了局部放电测量。最终的大型380 kV电缆系统的质量没有发现异常。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号