OPERATION OF THE ELECTRICAL SYSTEM OF CRETE IN INTERCONNECTION WITH THE MAINLAND GRID: A STABILITY STUDY

机译:与大陆网互连的混凝土电气系统的运行:稳定性研究

获取原文

摘要

Most of the autonomous island power systems suffer high electricity costs due to expensive fuels.Interconnection of such systems to large mainland systems is an option to reduce operational costs.Recent evolutions in both cable technology and AC/DC/AC conversion promise feasible solutions.Since interconnection projects are of high cost, their economic feasibility must be carefullyinvestigated; static, transient and dynamic system performance is crucial to reliably assess the volumeof exchanges between the island and the bulk system and consequently to estimate the economicfeasibility of the interconnection. This paper presents such an investigation, focusing on the transientstability issues, for the planned interconnection of the island of Crete to the Greek mainland.
机译:由于昂贵的燃料,大多数自治岛电力系统遭受高昂的电费。 此类系统与大型大陆系统的互连是降低运营成本的一种选择。 电缆技术和AC / DC / AC转换的最新发展有望带来可行的解决方案。 由于互连项目成本高昂,因此必须谨慎考虑其经济可行性 调查静态,瞬态和动态系统性能对于可靠地评估体积至关重要 岛与散货系统之间的交易量,从而估算经济 互连的可行性。本文提出了这样的研究,重点是瞬态 稳定问题,因为计划将克里特岛与希腊大陆连接起来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号