首页> 外文会议>IEEE International Telecommunications Energy Conference >Customer's 110kV power substations in the large data centers
【24h】

Customer's 110kV power substations in the large data centers

机译:客户的110kV电源变电站在大型数据中心

获取原文

摘要

This essay analyses the main construction requirements and technical key points of the 110kV substations' construction basing on the local power system planning and the actual requirements of data centers. Firstly, it provides solutions on the substations' overall power supply planning and layout requirements. Next the viewpoints on choosing reasonable electrical connection methods and main electrical power devices are discussed, including main the transformers, breakers and main buses. Meanwhile, since that the substations and data centers locate on the same site and they share a common earthling, the earthling requirements of power devices and cables are mentioned.
机译:本文分析了110kV变电站建设的主要施工要求和技术重点,基于本地电力系统规划和数据中心的实际要求。首先,它为变电站的总电源规划和布局要求提供了解决方案。接下来,讨论了选择合理的电连接方法和主要电力设备的观点,包括变压器,断路器和主总线。同时,由于变电站和数据中心定位在同一地点,并且它们共享共同的地球,因此提到了电力装置和电缆的地球岭要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号