首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >PERFORMANCE OF ACCELERATED BRIDGE CONSTRUCTION CONNECTION IN BRIDGES SUBJECTED TO ESTREME EVENTS
【24h】

PERFORMANCE OF ACCELERATED BRIDGE CONSTRUCTION CONNECTION IN BRIDGES SUBJECTED TO ESTREME EVENTS

机译:受到大事件影响的桥梁中加速桥梁施工连接的性能

获取原文

摘要

This paper summarizes the findings from NCHRP Project 20-68A, Domestic Scan 11-02on “Best Practices Regarding the Performance of Accelerated Bridge Construction (ABC)Connections in Bridges Subjected to Multi-Hazard and Extreme Events”. The objective of thisDomestic Scan was to identify connection details that can be used for ABC and which performwell under extreme events, including waves and tidal or storm surge loads, earthquakes, blast,and other large lateral forces. Topics covered include findings on published ABC designguidelines, standard ABC components and connections, research results, field case studies,lessons learned, and Scan Team recommendations.
机译:本文总结了NCHRP项目20-68A国内扫描11-02的发现 关于“关于加速桥梁施工性能的最佳实践(ABC) 易受多种危险和极端事件影响的桥梁连接”。这个目的 国内扫描旨在识别可用于ABC的连接详细信息,并执行 在极端事件(包括海浪和潮汐或风暴潮负荷,地震,爆炸, 和其他较大的侧向力。涵盖的主题包括有关已发布的ABC设计的发现 准则,标准的ABC组件和连接,研究结果,现场案例研究, 经验教训,以及扫描小组的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号