【24h】

Recent Advances in Software Reliability Assurance

机译:软件可靠性保证的最新进展

获取原文
获取外文期刊封面目录资料

摘要

Achieving true service agility requires development teams to be able to continuously integrate and deliver software every few weeks. This requires capabilities for test automation, modelling and prediction of software reliability. In this paper, we report on our recent experiences applying a simple and novel curve shifting technique to software defect prediction for a continuous integration, continuous delivery project. The technique transforms the defect arrival curve from a given previous release using the user story (or feature)1 development plan so as to predict defect arrival for the required release. We also discuss the different views on software defects from a quality vis-a-vis project management perspective and how the proposed technique applies to either.
机译:实现真正的服务敏捷性需要开发团队能够每隔几周连续整合和交付软件。这需要测试自动化,建模和软件可靠性预测的功能。在本文中,我们报告了我们最近的经验,适用于持续集成,连续交付项目的软件缺陷预测的简单和新颖的曲线移位技术。该技术使用用户故事(或特征)从给定先前发布的缺陷到达曲线转换缺陷到达曲线 1 开发计划以预测所需释放的缺陷到达。我们还讨论了对质量VIS-VIS项目管理视角的软件缺陷的不同视图以及所提出的技术如何适用于任何一种。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号