首页> 外文会议>International conference on principles and practice of constraint programming >Proactive Workload Dispatching on the EURORA Supercomputer
【24h】

Proactive Workload Dispatching on the EURORA Supercomputer

机译:EURORA超级计算机上的主动工作量调度

获取原文

摘要

In the era of Cloud Computing, Big Data, and Quantum Physics Simulations, data centers play in the world ICT infrastructure a role as big as (sadly) their power consumption. In many cases, a surprising amount of such consumption is due to idle resources, either introduced to face workload peaks or leftovers of workload fragmentation. In this context, proactive workload dispatching has the chance to improve the utilization of computing resources, thus reducing the idle time and improving the ability to handle peaks. In this paper, we devise a CP based approach for proactive workload dispatching on the EURORA supercomputer placed at the CINECA computing center in Bologna. The new system is evaluated on simulated job traces, where it leads to remarkable improvements in terms of both machine utilization and waiting times for queued jobs with respect to the currently used dispatcher, i.e., Portable Batch System (PBS).
机译:在云计算,大数据和量子物理模拟时代,数据中心在世界ICT基础设施中的作用与功耗相当(非常)。在许多情况下,此类消耗的数量惊人地归因于空闲资源,这些资源要么被引入来面对工作负载高峰,要么是工作负载碎片化的残余。在这种情况下,主动的工作负载分派有机会提高计算资源的利用率,从而减少了空闲时间并提高了处理高峰的能力。在本文中,我们设计了一种基于CP的方法,用于在位于博洛尼亚CINECA计算中心的EURORA超级计算机上进行主动工作量分配。相对于当前使用的调度程序,即便携式批处理系统(PBS),该新系统在模拟的作业跟踪上进行了评估,从而在机器利用率和排队作业的等待时间方面都取得了显着的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号