首页> 外文会议>International conference on nuclear engineering >INSTRUMENT CALIBRATION IN THE NUCLEAR POWER PLANT REFUELING CYCLE EXTENSION PROJECT
【24h】

INSTRUMENT CALIBRATION IN THE NUCLEAR POWER PLANT REFUELING CYCLE EXTENSION PROJECT

机译:核电站改造循环扩展项目中的仪器校准

获取原文

摘要

Nuclear power plant refueling cycle extension is an effective way of nuclear power plant to improve economic benefit. This paper, about the Qinshan Nuclear Power Plant phase Ⅱ 1&2 unit, combination the practical refueling period experience of 12 months refueling period was extended to 18 months, focus on the instrument calibration extension methods of the refueling cycle extension project. Instrument in nuclear power plant running plays very important role, various instruments in the extension period after extended whether their properties still remain available and reliable, require detailed and reliable demonstration. Considering the Qinshan Phase Ⅱ instrument equipments are purchased from multinational nations and different manufacturers, in this paper, the various demonstration methods are analyzed and compared, from all these methods, we chose the best one as the primary method in the actual demonstration ,and use the others as supplemented methods by the demonstration strategies, and the main methods are detailed in the description and examples, so these can ensure that the instrument refueling cycle extension strategy is reliability.
机译:延长核电厂的加油周期是核电厂提高经济效益的有效途径。本文针对秦山核电站二期一期和二期机组,结合实际的加油期经验,将12个月的加油期延长至18个月,重点是加油周期延长项目的仪器标定延长方法。仪器在核电站运行中起着非常重要的作用,各种仪器在扩展期后,其性能是否仍然保持可用和可靠,需要详细而可靠的论证。考虑到秦山二期仪器设备购自跨国公司和不同制造商,本文对各种演示方法进行了分析和比较,在所有这些方法中,我们选择最佳的一种作为主要的演示方法,并在实际使用中使用。其他方法作为示范策略的补充方法,在说明和示例中详细介绍了主要方法,从而可以确保仪表加油周期延长策略的可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号