2014 Pacific Basin Nuclear Conference and Technology Exhibit Regulatory Oversight on Nuclear Safety in Taiwan

机译:2014年太平洋盆地核会议和台湾技术展览会对核安全的监管监督

获取原文

摘要

Taiwan is a densely populated island and over 98% of its energy is imported, 16.5% of which is nuclear, in the form of materials and services. Ensuring that the most stringent nuclear safety standards are met therefore remains a priority for the government and the operator, Taiwan power Company (Taipower). There are eight nuclear power reactors in Taiwan, six of which are in operation and two are under construction. The first began operating nearly 40 years ago. For the time being the issue of whether to decommission or extend life of the operating units is also being discussed and has no conclusion yet. Nuclear energy has been a hot issue in debate over the past decades in Taiwan. Construction of Lungmen nuclear power plant, site selection of a final low-level waste disposal facility, installation of spent fuel dry storage facilities and safety of the currently operating nuclear power reactors are the issues that all Taiwanese are concerned most. In order to ensure the safety of nuclear power plant, the Atomic Energy Council (AEC) has implemented rigorous regulatory work over the past decades. After the Fukushima accident, AEC has conducted a reassessment program to re-evaluate all nuclear power plants in Taiwan, and asked Taipower to follow the technical guidelines, which ENSREG has utilized to implement stress test over nuclear power plants in Europe. In addition, AEC has invited two expert teams from OECD/NEA and ENSREG to conduct peer reviews of Taiwan's stress test national report in 2013. My presentation will focus on activities regulating safety of nuclear power programs. These will cover (A) policy of nuclear power regulation in Taiwan, (B)challenges of the Lungmen Plant, (C) post-Fukushima safety re-assessment, and (D)radioactive waste management.
机译:台湾是一个人口稠密的岛屿,其98%以上的能源以材料和服务形式进口,其中16.5%是核能。因此,确保满足最严格的核安全标准仍然是政府和运营商台湾电力公司(Taipower)的当务之急。台湾有8座核动力反应堆,其中6座正在运行,2座正在建设中。第一次开始运行大约40年前。暂时还正在讨论是否要停用或延长操作单元的寿命的问题,目前尚无定论。过去几十年来,核能一直是台湾辩论中的热门话题。台湾人民最关心的问题是龙门核电站的建设,最终低放废物处置场址的选择,乏燃料干存储设施的安装以及当前运行中的核反应堆的安全性。为了确保核电厂的安全,在过去的几十年中,原子能委员会(AEC)进行了严格的监管工作。福岛事故后,AEC进行了重新评估计划,以重新评估台湾的所有核电厂,并要求台电遵循技术准则,该准则已被ENSREG用来对欧洲的核电厂进行压力测试。此外,AEC邀请了来自OECD / NEA和ENSREG的两个专家团队在2013年对台湾的压力测试国家报告进行同行评审。我的演讲重点是规范核电计划安全的活动。这些内容将包括:(A)台湾的核电监管政策,(B)龙门工厂的挑战,(C)福岛核事故后的安全性重新评估以及(D)放射性废物管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号