首页> 外文会议>Annual IEEE India Conference >Rescheduling of real power for congestion management using Cuckoo Search Algorithm
【24h】

Rescheduling of real power for congestion management using Cuckoo Search Algorithm

机译:使用Cuckoo搜索算法对有功功率管理的有功功率进行重新调度

获取原文

摘要

This paper proposes a novel congestion management strategy by generator rescheduling in a deregulated electricity market. With growing electricity demands, power system is reaching towards its security limits where transmission lines play one of the vital rules in the system. Occurrence of transmission congestion can be avoided by one of the renowned technique i.e.; generator rescheduling technique. In this paper, Generator Sensitivity factor (GSF) is identified to select few generators to participate in congestion management problem. Next Cuckoo Search Algorithm (CSA) is used to minimize the rescheduling cost of generators. Present work is tested on IEEE 39 Bus New England Test System.
机译:本文提出了一种在电力市场放松管制下通过发电机重新调度的新型拥塞管理策略。随着电力需求的增长,电力系统已达到其安全极限,在该极限中,传输线扮演着系统中至关重要的规则之一。可以通过一种著名的技术来避免传输拥塞的发生。发电机重新调度技术。本文确定了发电机灵敏度因子(GSF),以选择少数发电机来参与拥塞管理问题。下一个布谷鸟搜索算法(CSA)用于最大程度地减少生成器的重新安排成本。当前的工作在IEEE 39总线新英格兰测试系统上进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号